Roger Johnson Consulting Limited prides itself on immediate response for our clients. Our network of approved contractors are selected for their honesty and ability to perform. With our site supervision, a project is completed with professionalism and the lowest possible expenditure. We are one of the few experienced consultants that can effectively act in an emergency or crisis situation to get things saved or built quickly. Our staff expands beyond other consultants that have the usual inspectors, technicians and engineers that can write a tender, a project, and provide quality assurance and quality control. We have the construction knowledge to build the job and we maintain our own construction forces and equipment. Through our experienced and approved contractor list, Roger Johnson Consulting can mobilize five million dollars in a variety of construction equipment within one hour. If there is a collapsed bridge, a roadway washout, a seismic event structure(s) failure, a water break, a flood, or hazardous material spill, we are the one our clients call when the going gets tough. We will put men on site within one hour anywhere in the Lower Mainland, within three hours provincially, and twelve hours anywhere worldwide.
CASE 1 - School Water Main Break
A 3 inch water main break occurred in a lower mainland school on New Years Eve 1999. The damage to the school was significant. A parking lot was damaged and the hallways and cafeteria was flooded. More importantly, no one knew where the break occurred, the extent of the failure or where to find contractors who could expediently and effectively perform the repairs. The client's staff were currently busy repairing two other breaks and consequently overloaded. Roger Johnson Consulting had a crew and equipment heading to the site within 5 minutes of the call. On site, Roger Johnson met the facility manager and they prepared the work plan. The water break was exposed within two hours at a depth of ten feet. The line had corroded and needed complete replacement. Roger Johnson Consulting Limited supervised the project proceedings as the external contractor excavated, shore, tunneled, jack hammered, removed interior floor slabs, saw cut, and core drilled through excavated wall footings in advance of the soldering crews. This joint operation using facility staff resulting in the work being done in record time with the school opening up on schedule with water service.
| home
| rjc
solution shop | skunk
works | project
management | contract
writing |
|
|